References


Railway station renovation on Lake Balaton in Hungary

Condition environments preserving historic buildings

The complete renovation of the Balatonszentgyörgy railway station required the intervention of Tekno Point for air conditioning without any alteration of the exterior fronts of the building. The main objective of the reconstruction was to redevelop the passenger space inside and outside the station, improving the quality of service and the level of comfort of the workplaces, without however altering the external aspect. Efficiency and architectural decor were the key words behind this project. For this purpose, multisplit Elfo units are installed, combined with wall and cassette internal units. completely invisible from the outside. These condensers allow to air conditioning both in summer and winter without any aesthetic impact.

DISCOVER ELFO MULTISPLIT

The trademarks and trade names mentioned are used for informational purposes, to indicate projects in which our products have been used. Each trademark is the property of its respective owner, and their use does not imply any endorsement, sponsorship, or affiliation.

Contact us
For any request please fill out the form below!



I accept the Privacy conditions* (Read)

Authorize

La società Tekno Point Italia Srl Unipersonale, con codice fiscale 04199790272, ha ricevuto nel corso dell'anno 2020 e 2021 aiuti di stato che verranno pubblicati sul RNA.

Share Capital € 50,000.00 i.v. | C. F. and number Register of Companies Register 04199790272 | Copyright 2021 Tekno Point - Invisible Climate System. All right Reserved
Company subject to management and coordination by Etic Group Srl - P.IVA e C.F. 04675730271 - REA VE-439719
Privacy Policy - Cookie Policy

Powered by WebIndustries